Why GenCost Gets Nuclear Wrong
CSIRO's GenCost 2024-25 is the single report every politician and journalist reaches for to say nuclear is too expensive for Australia — a headline A$173–288/MWh for nuclear against A$76–131/MWhfor firmed renewables. Here's the thing: GenCost doesn't fabricate that number. It buries the assumptions that decide it. Move them yourself below.
Recalculate GenCost yourself
GenCost doesn't fabricate nuclear's cost — it's radically transparent and internally consistent. What it does is bury the assumptions that decide the answer: a 30-year capital-recovery period (its own analysis shows 60 years cuts the figure only ~10%, yet it headlined 30), a capacity-factor floor of 53% benchmarked to Australian coal dispatch rather than nuclear's ~90% capability, and a 7% discount rate that — on the most capital-heavy technology — does most of the work. Stack the defensible alternatives and a mature fleet lands near A$125/MWh, competitive with the top of firmed renewables. But honesty cuts both ways.
The assumptions that decide it
Four inputs do almost all the work. None of them is a faked number — each is a choice, and CSIRO chose the conservative end of every one. (Honestly: no single change makes nuclear cheapest — they only bite when stacked, and the biggest lever runs against nuclear. See the verdict below.)
Asset life (capital-recovery period)
The marquee dispute — and the strongest defensible critique, because CSIRO's OWN sensitivity (Table 2-1) shows 60 years cuts large-scale LCOE only ~9–10%, yet it headlined 30. Why so small: a 60-yr loan racks up ~131% more interest at 7%, ~40% of LCOE is non-capital, and discounting makes years 31–60 nearly worthless. It only delivers a big cut PAIRED with a low discount rate.
GenCost 2024-25 Table 2-1; World Nuclear Association submission
Capacity factor
LCOE scales as 1/CF on the ~60% of cost that's capital — so the 53% FLOOR drives most of GenCost's wide spread. CSIRO concedes 89%→93% is only ~A$5/MWh, so the fight is the 53% floor: of the 51 reactors below 60% in 2023, most were French units returning from repairs (clean-2019 data: only ~5% genuinely <60%). The honest tension advocates must own: you can't claim BOTH 90% baseload AND nuclear-as-flexible-firming.
GenCost 2024-25 §2.2 & §6.2.5; WNA submission
Discount rate / WACC
The largest lever favourable to nuclear (>60% of its LCOE is financing) — but the WEAKEST to call 'bias'. A single uniform rate is the mainstream convention (NREL, AEMO) and arguably the FAIR, technology-neutral choice; it only disadvantages nuclear because nuclear genuinely IS the most capital-heavy option. Government financing lowers cost by SHIFTING overrun risk onto taxpayers, not removing it — and the same low rate would also cut renewables.
GenCost 2024-25 discount-rate section; IEA/NEA 2020
First-of-a-kind premium
The most powerful lever — and it runs AGAINST nuclear. +120% roughly DOUBLES the capital component, dwarfing the ~10% from 60-yr life. Vogtle and Snowy 2.0 both ran ~100% over budget. An honest recalculator must never hide this. The one clean critic WIN here is SMR labelling: GenCost costs SMR at FOAK (~A$29,600/kW) while EVERY other tech is NOAK — vs US EIA's NOAK ~A$14,000/kW — an apples-to-oranges comparison CSIRO concedes it can't cleanly strip.
GenCost 2024-25 Table 3-1 (Flyvbjerg & Gardner 2023); IEEFA Sep 2024; US EIA 2024
What GenCost gets right
A critique you can't trust is worthless — so here's the other side, conceded plainly. GenCost is radically transparent (it publishes every workbook) and several of its choices are defensible. This is where the honest line falls.
The bottom line
The honest conclusion isn't 'nuclear is cheapest.' It's that GenCost's nuclear number is highly sensitive to defensible assumptions CSIRO chose conservatively — and that the single biggest lever, first-of-a-kind cost, runs AGAINST nuclear. A mature, government-financed fleet running flat out is competitive. A first Australian plant, with the +120% premium GenCost itself suggests, is not. Both of those are true, and the page shows both.
Source: CSIRO/AEMO GenCost 2024-25Final Report (Graham, Hayward & Foster, July 2025), App. Tables B.1/B.9 & §2–3; plus submissions from the World Nuclear Association, IEEFA, the Centre for Independent Studies and US EIA. This page critiques GenCost's assumptions — it does not allege faked numbers; GenCost is internally consistent and publishes its full method.