Energy Insiders Podcast: Fast lane to electric, and Snowy blowouts

A podcast episode featuring Bruce Hardy from the Energy Futures Foundation discusses fast-tracking electric transport and recent cost blowouts and delays at Snowy Hydro's pumped storage project. The episode touches on Snowy 2.0, which has announced another cost and schedule revision, and sits alongside reporting that the project is now worth more than $25 billion.
Where this fits
Snowy 2.0 is the lynch-pin of Australia's renewables-firming strategy. It is supposed to store wind and solar output and release it on demand, converting weather-dependent generation into dispatchable power. Repeated cost blowouts and delays on the single largest firming asset underscore a hard truth about renewable grids: the firming infrastructure that makes them work is capital-intensive, long-lead, and prone to overrun. This is not a glitch in the transition plan. It is the cost of the plan itself.
What it means
Australia has bet the grid on the idea that renewable generation plus pumped hydro and battery storage can replace firm coal and gas at manageable cost. Snowy's trajectory, climbing past $25 billion, missing milestones, reveals the real bill of that bet. Every dollar spent on late, over-budget firming is a dollar that could have procured firm, low-material, long-lived nuclear generation, which Australia is legally prohibited from building. The grid will get firming. The question is whether it will be expensive and delayed, or cheaper and faster. So far, the chosen path has answered that.
By the numbers
enough for 15–23 TWh a year of firm, always-on power, generating for ~60 years. Source: CSIRO GenCost 2024-25 (A$8.5–13.2bn/GW), IAEA capacity factor.
Figures are indicative conversions from the article's stated quantity using published cost, material and capacity factors (CSIRO GenCost, BNEF, IEA, IAEA). Ranges, not precise forecasts.
Go deeper on the numbers
The bigger picture
Energy security is national security. This connects to the wider case at Unprepared: Australia's dependence on a strategic rival, and how ready it is for the world that is coming.
Reported by RenewEconomy. Read the original report ↗
Related coverage
Snowy 2.0: A monument to this nation’s energy policy hubris - The Australian
Gas reserve ‘could blow away $330bn’ - The Australian
It might not feel like it, but our power is among the world’s cheapest - AFR
First new steel mill in Australia in 35 years to be the first to be powered by 100 per cent renewables - Renew Economy
The numbers, as they move
A short, sourced brief when the figures shift: a transmission blow-out, a supply-chain move, a milestone.