Snowy 2.0 price tag soars to $25b, 10 times initial estimate - AFR

The cost of Snowy Hydro 2.0, the 26-year-old proposal to pump water between existing reservoirs for energy storage, has blown out to $25 billion. This is roughly ten times the initial estimate from the early 2000s. The project, now under construction, is a pumped-hydro scheme designed to store renewable energy and dispatch it when the sun and wind are not generating. No completion date was given in the reporting.
Where this fits
Snowy 2.0 is the linchpin of Australia's plan to firm a renewables-heavy grid without nuclear power. The tenfold cost overrun is a live case study in how whole-system costs for a renewables-only transition are being chronically underestimated at the outset. Pumped hydro is firm, dispatchable storage, the thing a weather-dependent grid needs, but the capital cost per megawatt-hour of storage is now revealed as far steeper than early modelling suggested. This is not a renewable-technology failure; it is an infrastructure-complexity and project-delivery failure that affects the sums.
What it means
Australia is betting its grid stability on storage infrastructure that costs vastly more than budgeted, with no firm timeline for completion. Every year of delay means a larger share of the grid is renewable and weather-dependent, forcing continued reliance on gas peaking plants to keep the lights on. The alternative, firm, energy-dense nuclear power, with no storage tail and no weather dependency, remains legislatively banned, even as the true cost of the renewable-storage pathway climbs into view.
By the numbers
enough for 15–23 TWh a year of firm, always-on power, generating for ~60 years. Source: CSIRO GenCost 2024-25 (A$8.5–13.2bn/GW), IAEA capacity factor.
Figures are indicative conversions from the article's stated quantity using published cost, material and capacity factors (CSIRO GenCost, BNEF, IEA, IAEA). Ranges, not precise forecasts.
Go deeper on the numbers
The bigger picture
Energy security is national security. This connects to the wider case at Unprepared: Australia's dependence on a strategic rival, and how ready it is for the world that is coming.
Reported by GNews: AFR energy. Read the original report ↗
Related coverage
Snowy 2.0: A monument to this nation’s energy policy hubris - The Australian
Gas reserve ‘could blow away $330bn’ - The Australian
It might not feel like it, but our power is among the world’s cheapest - AFR
First new steel mill in Australia in 35 years to be the first to be powered by 100 per cent renewables - Renew Economy
The numbers, as they move
A short, sourced brief when the figures shift: a transmission blow-out, a supply-chain move, a milestone.