Snowy Hydro says long-awaited cost reveal is “imminent”, faces gas supply issues at new Kurri K... - Renew Economy

Snowy Hydro has indicated a cost reveal for its expansion project is coming soon, but the utility is also flagging gas supply constraints at its new Kurri Kurri gas plant. The timing matters: Snowy 2.0 was pitched as a firming solution for renewables, yet the company is simultaneously wrestling with gas availability for its own thermal station, which is designed to provide firm power when wind and solar fall short.
Where this fits
This is a live example of the hidden cost of a renewables-heavy grid. Snowy Hydro is being forced to build gas capacity to make its hydro scheme workable, and now faces the practical problem that Australia's gas supply is constrained. The story touches two core Energy Realism pressures at once: cost (the real price tag on the Snowy expansion remains unclear) and reliability (gas firming is unreliable if gas itself is scarce). It also illustrates why the firm-power problem cannot be solved by one technology alone. A nuclear alternative would sidestep this gas-supply dependency entirely.
What it means
Australia is building a grid that depends on multiple technologies working in concert, each with its own supply chain and constraint. When one piece, gas, becomes tight, the whole system's resilience weakens. The Snowy expansion will be expensive; adding a gas plant on top makes it more expensive still. A firm, non-combustible alternative would cost more upfront but would not leak energy security through gas imports or price spikes, and would not require a separate firming source at all.
Go deeper on the numbers
The bigger picture
Energy security is national security. This connects to the wider case at Unprepared: Australia's dependence on a strategic rival, and how ready it is for the world that is coming.
Reported by GNews: RenewEconomy. Read the original report ↗
Related coverage
Snowy 2.0: A monument to this nation’s energy policy hubris - The Australian
Gas reserve ‘could blow away $330bn’ - The Australian
It might not feel like it, but our power is among the world’s cheapest - AFR
First new steel mill in Australia in 35 years to be the first to be powered by 100 per cent renewables - Renew Economy
The numbers, as they move
A short, sourced brief when the figures shift: a transmission blow-out, a supply-chain move, a milestone.