Future of Queensland’s $18b pumped hydro project hangs in the balance - AFR

Queensland's proposed $18 billion Kidman Springs pumped hydro project, a 12-gigawatt facility designed to store renewable energy, faces an uncertain future. The scheme, which would pump water uphill to a reservoir during periods of high renewable generation and release it downhill through turbines when demand peaks, has stalled amid planning delays, cost pressures, and financing hurdles. No final investment decision has been made, and the project's timeline remains unclear.
Where this fits
Pumped hydro is firm, dispatchable power: it solves the core problem of a renewables-only grid, which is that wind and solar output does not match demand. An $18 billion pumped hydro project is not an alternative to renewables; it is the cost of making renewables work reliably. Its delay exposes the hard trade-off between cheap renewables per megawatt-hour and the full system cost of firming capacity, transmission overbuild, and storage. This is the bill that renewable-only pathways must carry.
What it means
Without large-scale dispatchable storage, Australia cannot retire its coal fleet on schedule while maintaining grid stability. The delay to Kidman Springs means either more gas-fired peaking capacity (with higher marginal emissions per megawatt-hour served), or reliance on interstate transmission to borrow capacity from distant renewables, itself expensive, lengthy to build, and exposed to weather correlation across regions. A low-emissions, firm alternative, nuclear, remains prohibited by law, removing a generation source that would bypass the need for massive storage and transmission overbuild. Queensland is discovering that a renewables grid still needs firming; the question is only whether that firming comes via gas, storage, or a firm low-carbon source the law forbids.
By the numbers
enough for 11–17 TWh a year of firm, always-on power, generating for ~60 years. Source: CSIRO GenCost 2024-25 (A$8.5–13.2bn/GW), IAEA capacity factor.
Figures are indicative conversions from the article's stated quantity using published cost, material and capacity factors (CSIRO GenCost, BNEF, IEA, IAEA). Ranges, not precise forecasts.
Go deeper on the numbers
The bigger picture
Energy security is national security. This connects to the wider case at Unprepared: Australia's dependence on a strategic rival, and how ready it is for the world that is coming.
Xi Jinping and the Purge That Built an Army
The PLA that Xi Jinping inherited in 2012 was modernising, and the one he commands in 2026 is transformed. Part IV of the Unprepared series.
Reported by GNews: AFR energy. Read the original report ↗
Related coverage
What grid-forming kit are Australia’s largest solar–BESS hybrids using?
New four-hour battery storage proposal seeks federal green tick for Australia’s most renewable state grid
SA gives green light for gas to help power future data centres - ABC News & Headlines – Australian Broadcasting Corporation
Concentrated Solar Power (CSP) in Australia: Can It Work Alongside Rooftop Solar? - Energy Matters
The numbers, as they move
A short, sourced brief when the figures shift: a transmission blow-out, a supply-chain move, a milestone.